Marathon Sprint Series Instruções de Operação Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 10
Montage sprint / marathon
10
Trim (e.g. saw off and debur) projecting part of ceiling bracket (4).
Release rear cut-off buffer (1) and push right back to stop (2). Open
door (3) by hand.
Push cut-off buffer (1) right up to bogie unit (5). Securely tighten
screw on cut-off buffer (1).
Fitting and connecting push-button
Position the push-button in such a way that the operator can see
the door, while he/she is not inside the operating area of the
door.
Never run button cable (length 7 m) along a power cable as this can
cause the control unit to malfunction. The control unit is shipped with the
button cable connected.
Lay button cable and secure in position.
Install push-button (1) in an appropriate, easily accessible location
inside the garage. Minimum height from floor - 1.6 m.
Install push-button cable (2) in garage. Connect end of cable to
push-button (1).
18
1,6m
2
1
18
17
4
N
1
2
6
max. 30°
4
5
3
17
Installing the socket outlet
Socket may only be installed by a qualified electrician. Protect
socket with a fuse (16 A slow-blow type).
Observe all applicable regulations (e.g. VDE, etc.)!
Install socket (1) on ceiling at a distance of approx. 0.5 meters to the
control unit housing (2).
Install and connect the line from the power socket (1) to the power
mains.
Do not plug the connector (3) into the socket outlet yet!
19
19
ca. 0,5m
1
2
3
ca. 0,5m
11
3
2
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 34 35

Comentários a estes Manuais

Sem comentários